Danae Buildtech Installs 10 Million SqM Gypsum Board Line in Cambodia

Nov 16, 2026 Leave a message

Danae Buildtech is currently on-site in Cambodia, executing the mechanical installation of a 10-million-square-meter annual gypsum board line, alongside a 90,000-ton gypsum powder line.

 

Many overseas buyers know the frustration: the equipment arrives, but the supplier washes their hands of the installation, leaving local workers to figure out complex drawings. Misaligned rollers, vibrating motors, and endless delays follow. That is exactly why our own engineering supervisors are on the ground.

Why Start with the Batching System?

 

Before the board forming, raw material must be fed with absolute precision.

 

Twin hoppers for material batching

 

Here you can see the twin hoppers and automatic batching frame being set up in the open-air section. Our technicians are currently calibrating the belt scales and verifying gate valve tolerances.

The technical focus: Checking motor alignment and reinforcing belt tensioners.

The real-world benefit: Cambodia's high humidity causes standard belts to stretch. By heavy-duty upgrading these components now, we are preventing costly 24/7 operational downtime later.

 

The Multi-Layer Dryer: Where Board Quality is Decided

The dryer is the heart of the gypsum board line. If the board jams inside, the whole line stops.

The massive steel structure is being erected. Our team is doing two critical things here:

Sealing the hot air ducts to prevent energy loss.

Aligning the transfer rollers on every single layer. Even a 1mm deviation will cause boards to jam and break during drying.

For the plant owner, this precise alignment directly translates to lower fuel consumption and a higher finished board yield rate.

Multi-layer dryer structure assembly
 

Heat Source and Environmental Compliance

 

 

A stable heat supply and strict emission control are non-negotiable for modern plants.

 

Hot air furnace with piping system

 

This red industrial hot air furnace is the primary heat source. We are paying special attention to the combustion chamber and flue gas connections. Environmental regulations in Southeast Asia are getting stricter. We have integrated an exhaust gas treatment system right from the planning stage.

 

Exhaust gas treatment tower and valves

 

The treatment tower and piping network are being assembled. The pipe connections and valve assemblies here are being strictly leak-tested. Why is this critical? If the exhaust system leaks, local authorities can shut down the entire plant. We ensure the system is airtight before commissioning, saving the buyer from future regulatory headaches.

 

What This Installation Means for Your Next Project

 

 

Buying equipment is only half the battle. The installation phase determines whether you reach your designed capacity or get stuck in trial-run hell.

 

By having Danae Buildtech engineers physically present in Cambodia, we take full responsibility for the mechanical commissioning. We are currently completing the electrical cable routing and will soon move to the trial run phase.

 

If you are evaluating gypsum board machinery suppliers, this project is our proof of delivery-not just on paper, but with wrenches and alignment tools on the factory floor.