Gypsum board setting time

Aug 03, 2023 Leave a message

 

Gypsum board setting time


 

Gypsum slurry through the Board Forming machine add the upp and bottom protective paper formed the Soft and Wet Gypsum board. Usually its Initial setting time is 3-5 min, Finial setting time depends on the annual capacity of the production line, the smaller annual capacity, the speed of the production is slow, so the setting time is longer, about 10-12min; On the contrary, if the annual capacity is high, say 15 million square meters, the production speed is 30m/min, the finnal setting time is 7-8 min.

 

So the Finnal setting time depends on the annual capacity;

Besides, setting time also has important relationship with raw materials, the porption of the raw material, the quality of the raw material etc. If you met this kinds of question, please feel free to contact us by cellphone or what's app 0086 18713118368, professional questions to professional us, any problems related to the production line, we can offer the total solutions.

 

info-667-300